top of page
Rainwater regulation pond site tour H29.7.29

On July 29, a tour of the "Minamirinkan Rainwater Reservoir" under construction was held in the basement of Yamato Farm Site Park (tentative name). 178 neighboring residents, including 130 Southwest residents, participated.

After completion, it will be able to temporarily store about 14,000 cubic meters of rainwater. All the participants were surprised at the scale of the tour and at the same time had high expectations for the tour.

Here is the state of the tour.

◆ Scenery of the day
bottom of page